Tree Id: | 4 |
Primary ID: | 6034 |
Common Name: | Southern red cedar |
Scientific Name: | Juniperus silicicola |
DBH: | 12 |
Number of Stems (Multi Calc): | 1 |
Tree Height (Estimated): | 15 |
Mallet Test: | Inconclusive |
Health Condition: | Dead |
Structure: | Poor- a single serious defect or multiple significant defects. It could also indicate a recent change in trunk angle. Branch, root or trunk failure is probable. Defects may or may not be correctable. |
Utilites: | |
Family: | |
Observations-Characteristics: | |
Observations-Biotic Pest: | Other (see notes) |
Observations-Abiotic: | None observed |
Notes 1: | No living foliage or living vascular tissue observed or detected. |
Notes 2: | |
DBH Stem 1: | |
DBH Stem 2: | |
DBH Stem 3: | |
DBH Stem 4: | |
DBH Stem 5: | |
DBH Stem 6: | |
Code: | JUSI |
Cultivar: | |
DBH Range: | 12-18in |
Genus: | Juniperus |
Height Range: | 15ft-30ft |
Last Inspection: | |
Next Inspection: | |
Inspection Cycle: | |
Archived: | No |
Client Site: | St A-Marks |
House Number: | 229 |
Address Street: | Pelican Reef Drive |
Land Type: | Backyard |
Latitude: | 29.873028104914503 |
Longitude: | -81.29802494830543 |
ISA Board Certified Master Arborist: | Daniel Lippi FL-6145B |
Tree Work-Pruning: | Priority 3 Removal |
Tree Work-PHC: | |
Tree Work-Root/soil: | |
Priority: | |
Monitor: | No |
Cycle: | |
Pruning Specs and Notes: | |
Pruning spec-type of cut: | |
Pruning spec-location of cut: | |
Pruning spec-# of cuts: | |
Pruning spec-size of cuts: | |
Pruning spec-% canopy removal: | |
User: | Danny |
Last Modified User: | Danny |
Date Added: | 05/19/2023 |
Last Modified: | 05/19/2023 |
Assessment Level : | Level 2 - Detailed 360ยบ ground level visual inspection of a tree and its surrounding site w/mallet test. |
Assessed Tree Part: | |
Likelihood of Failure: | |
Likelihood of Impacting Target: | |
Likelihood: | |
Consequence of Failure: | |
Risk Rating: |
Sidewalk Previously Replaced: | No |
Infrastructure damage: | |
No. of sidewalk slabs: | 0 |
Infrastructure height lift (sidewalk/driveway): | 0 |
Infrastructure height lift (Valley gutter/street): | |
Slab grinding or other repair : | Not recommended |
Infrastructure recommendation: | None recommended |
Root barrier an option: |
TPZ Ratio: | |
Tree Protection Zone Inches: | |
CRZ Ratio: | |
Critical Root Zone Inches: |
Danny set Notes 1="No living foliage or living vascular tissue observ..." on May 19, 2023 at 1:45pm |
Danny set Photos="image.jpg, image.jpg" on May 19, 2023 at 10:12am |
Danny set Notes 1="No visible living foliage or living vascular tissu..." on May 19, 2023 at 10:10am |
Danny set DBH="12" on May 19, 2023 at 10:02am |
Danny set DBH Range="12-18in" on May 19, 2023 at 10:02am |
Danny set Tree Work-Pruning="Priority 3 Removal" on May 19, 2023 at 9:59am |
Danny set ISA Board Certified Master Arborist="Daniel Lippi FL-6145B" on May 19, 2023 at 9:59am |
Danny set Land Type="Backyard" on May 19, 2023 at 9:59am |
Danny set House Number="229" on May 19, 2023 at 9:59am |
Danny set Structure="Poor- a single serious defect or multiple signific..." on May 19, 2023 at 9:58am |
No results |
No results |